检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北方工业大学土木工程学院,北京100144 [2]中国航发北京航空材料研究院,北京100089
出 处:《北方工业大学学报》2017年第5期100-104,139,共6页Journal of North China University of Technology
摘 要:多跨钢混框架结构经常会遇到温度裂缝的问题,若没有采取有效的控制措施,裂缝将对建筑物的耐久性甚至安全造成一定影响.工程多采用设置后浇带以减少温度应力的不利影响,本文基于静力平衡法分析了后浇带设置对多跨框架结构温度应力的影响,得出对于100米超长混凝土结构承受季节降温15℃时最佳后浇带设置条数为1条.Temperature cracks often occur in multi-span reinforced concrete frame structure,and the cracks will impair the durability and even the safety of buildings if no effective measures are taken.Setting post-cast strip is a common measure to reduce adverse effects in civil engineering.This paper analyses the effect of the setting of post-cast strip on the temperature stress of multispan frame structure,and concludes that the optimal number of post-cast strip of 100 meters superlong concrete structure is one when the temperature seasonally goes down to 15 degrees centigrade.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3