检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国平煤神马集团炼焦煤资源开发及综合利用国家重点实验室,河南平顶山467000 [2]中煤科工集团重庆研究院有限公司,重庆400036
出 处:《矿山机械》2017年第11期47-50,共4页Mining & Processing Equipment
基 金:科技部"十二五"科技支撑计划项目(2012BAK04B00)
摘 要:针对平煤股份四矿的地面集中降温系统的运行情况,提出了用高低压转换装置代替原有高低压换热器的节能改造方案;对高低压转换装置的控制单元进行了研究,解决了阀门开关的精准控制和稳定运行的技术难题;实际运行情况表明,控制单元稳定可靠,液压系统油温适合,装置的进出冷水温升保持在0.6℃以下。According to actual operation situation of the ground centralized cooling system in Pingmei Fourth Mine, the paper put forward the energy-saving renovation scheme in which the pressure exchanger replacing the high and low pressure heat exchanger. In addition, it studied the control unit for the pressure exchanger, and solved the technical problems about precise control and stable operation of the valve. Actual operation showed: the control unit operated stably and reliably, the oil temperature of the hydraulic system appeared suitable, the temperature rise of inlet and outlet water of the pressure exchanger remained below 0.6 ℃.
分 类 号:TD727.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.90.172