检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘成保[1]
机构地区:[1]浙江省嘉兴市建筑工业学校,浙江嘉兴314000
出 处:《工程建设与设计》2017年第22期37-38,共2页Construction & Design for Engineering
摘 要:重点论述预应力管桩"耐打"问题的影响因素以及应对措施。结合工程现场实际案例和数据,分析了预应力管桩在锤击沉桩过程中出现桩身破坏和断桩的原因,并提出了施工中可以提高管桩耐打性的技术措施,特别是停锤标准设计问题,值得同行予以重视,并列举了出现较多坏桩、断桩后的补救(补桩)措施。This paper mainly discusses the influencing factors for the problem of "impact resistance" of prestressed pipe pile and the countermeasures. Based on the actual cases and data, this paper analyzes the reasons of the problem existing in the process of hammer sinking pile of prestressed pipe pile, and the problem are pile body breaking and broken pile, and puts forward the technical measures to improve the pile's ability of impact resistance, especially for the stander design of stopping hammer, it should be paid more attentions. Paper also lists the measures of maintaining the broken pile and the bad pile.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145