铁塔公司模式下高铁通信基站建设研究探讨  被引量:1

Research on Construction of High Speed Rail Communication Base Station Under the Mode of Tower Company

在线阅读下载全文

作  者:蓝维旱[1] 张鹏飞[1] 李小云 

机构地区:[1]江苏省邮电规划设计院有限责任公司,江苏南京210000 [2]中国铁塔股份有限公司儋州市分公司,海南儋州571700

出  处:《通信电源技术》2017年第5期133-134,共2页Telecom Power Technology

摘  要:如何破除传统高铁覆盖通信基站建设的束缚,引入新技术新手段,最大程度地提高共建率,减少建设成本,为运营商提供优质可靠的服务,这将是铁塔公司推向社会的一张新名片。文中分析了高铁覆盖特点,针对干扰分析、链路预算、站高和站距问题,结合西环铁路实际情况,提出规划思路、基站配置减负方案,创造性地引入铁路区间箱变引电系统策略。技术方案设计和效益分析表明,此方案明显优于运营商传统建设方案,从而开创高铁覆盖通信基站建设的铁塔模式。How to get rid of the traditional coverage of high-speed rail communication base station bound,introduce new technologies and means,maximize the build rate,reduce construction costs,provide quality and reliable services for operators,it will be a new name card of tower company to society. This article analyzed the high-speed railway coverage characteristics. According to the interference analysis,link budget,stand high and away from the station,combined with the actual situation of the Western Railway,the planning ideas and the burden of the base station configuration scheme was put forward. The strategy of railway inter box variable discharge system was creatively introduced. The technical scheme design and benefit analysis showed that this scheme was superior to the traditional construction scheme of operators,thus creating a tower model for the construction of high speed covered communication base station.

关 键 词:高铁覆盖 配置减负 箱变电力引入 效益分析 

分 类 号:TN929.5[电子电信—通信与信息系统]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象