检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李海伟[1] 李丁 杨攀峰[1] 杨德洲[2] 张中丹[2]
机构地区:[1]西北电力设计院有限公司,西安710075 [2]甘肃省电力公司经济技术研究院,兰州730050
出 处:《内蒙古电力技术》2017年第5期10-16,共7页Inner Mongolia Electric Power
摘 要:针对甘肃省750 kV嘉酒电网现状,对750 kV线路、主变压器、母线逐一进行N-1、N-2故障分析,提出了嘉酒电网存在的安全隐患。对照国务院599号令事故分级标准、国家电网公司安全事故调查规程,明确了安全隐患的事故风险等级。结合嘉酒电网实际情况和发展规划,提出了近期和规划期治理措施,可有效提高电网的安全可靠性。In view of the current situation of 750 kV power grid in Jiajiu power grid of Gansu province, "N-1" and"N-2" fault analysis methods are adopted to analyze the 750 kV line, the main transformer and the bus bar, and put forward the potential safety problems in the 750 kV Jiajiu power grid. According to The Accident Grading Standards of The State Council Degree 599 and the Safety Accident Investigation Procedures of State Grid, the potential safety hazard and accident risk level in Jiajiu 750 kV Power Grid is confirmed. Combined with the actual situation and development plan of Gansu Jiajiu power grid, the short-term and long-term control measures are put forward individually. The proposed measures have been adopted by the operation and planning departments, effectively improving the safety and reliability of the power grid.
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222