检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065
出 处:《水力发电》2017年第12期25-27,38,共4页Water Power
摘 要:西南某水电站大型倾倒变形体位于右坝肩顶部,其稳定性直接影响工程建设与运行的安全。在对该倾倒变形体的成因机制、结构、变形及力学特性进行分析的基础上,对开挖前的稳定性进行评价;结合施工处理方案及监测成果分析,对该倾倒体工程处理后的稳定性进行了复核评价。The large-scale toppling rockmass in a hydropower station in southwest China is located at the top of right abutment. Its stability directly affects construction and operation safety of station. The cause, structure, deformation and mechanical properties of the toppling rockmass are analyzed, and on the basis of analyses, the stability of the toppling rockmass before excavation is evaluated. Combining with engineering treatment scheme and monitoring data, the stability of the toppling roekmass after treatment is reviewed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3