机构地区:[1]中国中铁二院工程集团有限责任公司,成都610031 [2]中铁二局第二工程有限公司,成都610031 [3]西南交通大学交通隧道工程教育部重点实验室,成都610031
出 处:《路基工程》2017年第6期225-229,共5页Subgrade Engineering
摘 要:合肥地铁1号线试验段终点—云谷路站浅埋暗挖区间穿越膨胀土地层,因膨胀土的胀缩性、裂隙性等不良工程特性会对施工造成一定影响,选取合适的预加固措施能有效降低其影响。小跨度膨胀土隧道常采用的预加固措施有超前锚杆、超前小导管注浆、管棚等,通过数值计算,分析了超前小导管注浆对隧道稳定性的影响,并建议合肥地区浅埋暗挖隧道施工不进行小导管注浆。The shallow-buried excavation tunnel in the end of test section to Yungu road station of Hefei metro line 1 passes through expansive soil. Due to the poor expansive engineering characteristics, such as swell- shrink characteristic and cranny property, it will affect the tunnel construction. Reasonable pre-reinforcement measures can effectively reduce the impact. Forepoling bolt, advanced small pipe grouting and pipe roof are always used in small span expansive soil tunnel. The effect of advanced small pipe grouting on the stability of tunnel is analyzed through numerical calculation and advanced small pipe grouting is not suggested in shallow- buried excavation tunnel in Hefei.
关 键 词:膨胀土 浅埋暗挖隧道 预加固措施 超前小导管注浆 地表沉降
分 类 号:U416.167[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3