检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州粤能电力科技开发有限公司,广州510075 [2]华能国际电力股份有限公司海门电厂,广东汕头515132
出 处:《大电机技术》2017年第6期5-9,15,共6页Large Electric Machine and Hydraulic Turbine
摘 要:针对某1000MW汽轮发电机定子线棒层间温差和引水管出水温差超标的问题,分析了定子线棒空心铜线堵塞的原因。具体介绍一套酸洗,活化,镀膜的化学清洗工艺。发电机定子冷却水系统通过化学清洗,除去了空心铜线的腐蚀产物,降低了定子线棒层间温差,确保1000MW汽轮发电机安全、经济运行,具有较大的实用性和经济性。Aiming at the problem of the interpass temperature of stator bars and the water outlet pipein a 1000MW turbo-generator, the paper analyzed the reason for the blockage of hollow copper wirein stator bar. This paper specifically introduced a set of pickling, activation, coating and otherchemical purging process. With the help of chemical purging, the corrosion product of hollow copperwire could be removed from generator stator cooling water system, hence interpass temperature ofstator bars would be decreased. All of these could ensure the safety and economical operation of the1000MW tubogenerator. It is practical and economical.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.8