改善丰满重建电站水力稳定性的技术措施  

The Technical Measures for Improving Hydraulic Stability of Reconstruction of Fengman Power Station

在线阅读下载全文

作  者:王向志 史千[1] 吴喜东[1] 明亮[2] 聂文昭[2] 

机构地区:[1]水力发电设备国家重点实验室(哈尔滨大电机研究所),哈尔滨150040 [2]国网济宁供电公司,济宁272000

出  处:《大电机技术》2017年第6期62-65,共4页Large Electric Machine and Hydraulic Turbine

摘  要:丰满电站水轮机额定出力为204MW,水头变幅H_(max)/H_(min)=1.61范围超过了混流式水轮机常规的适应范围,机组运行范围比常规电站宽广,机组需要频繁在小负荷进行调峰、调频运行,并且,重建后出现了8台机组在不同2个电网中进行调峰调频工作。因此对机组的稳定性要求更高,尤其是部分负荷的稳定性。本文结合丰满电站特定的运行条件,提出了模型开发过程中改善丰满水轮机稳定性的措施,通过试验验证,满足丰满电站的运行特点。The fengman power station turbine rated output is 204MW, the variation range of head Hmax/Hmin=1.61 is more than that of conventional Francis turbine. The operating range of the unit is wider than the conventional power station. The unit needs frequent peak-frequency modulation in small loads, and the reconstruction of eight units need work in two different power grids for peak-frequency modulation, therefore, the stability of the unit is higher, especially the partial load stability. The article combined with the operational characteristics of fengman power station, puts forward the measures to improve the stability of the turbine during the model development, through experimental verification, meeting the operational characteristics of Fengman power plant.

关 键 词:混流式水轮机 丰满重建电站 模型转轮 稳定性 

分 类 号:TK730.2[交通运输工程—轮机工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象