检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]云南电网有限责任公司大理供电局,云南大理671000 [2]云南电网有限责任公司电力科学研究院,昆明650217
出 处:《云南电力技术》2017年第5期32-36,共5页Yunnan Electric Power
摘 要:实现架空地线融冰,由于地线型号多样、微气象、地理环境多样等客观因素造成的复杂性,需综合考虑最小融冰电流、最大允许载流量、合理的融冰方式、技术和经济可行的直流融冰装置等因素,本文通过理论和实例分析,证明了可实现架空地线直流融冰的工程实施,且实现架空地线融冰是一项系统性工程和精细化工程。Implementation de-icer of overhead ground wire, because of various objective factors for the ground model diversity, micro meteorological, geography diversity, caused complexity of the de-icer, the need to consider the smallest ice-melting current, the maximum allowable ampacity, reasonable ice-melting method, technical and economic feasibility of DC thawing device and other factors, this paper analyzed through theoretical and examples analysis, proved enables project implementation of DC de-leer for overhead ground wire, and the implementation overhead ground wire de-icer is a systematic and meticulous engineering.
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222