沙溪口坝下脱水段航道整治工程模型试验研究  被引量:1

Model experimental test of waterway regulation of dehydration section under Shaxikou hydropower station

在线阅读下载全文

作  者:彭伟 詹锐彪 王斐[1] 

机构地区:[1]交通运输部天津水运工程科学研究所,工程泥沙交通行业重点实验室,天津300456 [2]中交广州航道局有限公司,广东广州510221

出  处:《水运工程》2017年第12期169-173,184,共6页Port & Waterway Engineering

摘  要:针对沙溪口水电站坝下河段存在的枯水期船闸门槛水深及航道水深不足、流速大流态紊乱的碍航问题,采取筑坝、新建明渠及炸礁相结合的整治思路,调节左右汊分流比,抬高枯水期船闸出口水位,增加航道水深,调整流态,改善船舶航行条件。采用1∶50正态物理模型对航道整治方案进行试验研究,并根据设计方案存在的问题进行多方案研究分析,优化后方案船闸门槛水深、航道水深、流速及流态满足设计要求。To counter the problem of navigation-obstruction under Shaxikou hydropower station due to insufficient water depth on sill and channel in the dry season and the large velocity and disordered flow pattern in the channel,we follow the regulation idea of building dams and open channel combined with reef blasting to adjust the diversion ratio, raise the water level of the shiplock gate and channel during the dry season, adjust the flow state,and improve ship navigation conditions.Adopting the 1∶50 physical model test to study the waterway regulation scheme,and according to the problems existed in the design scheme,we analyze multiple schemes.By the optimized scheme,the water depth on sill and channel,flow velocity and flow pattern satisfy the design requirements.

关 键 词:沙溪口水电站 脱水段 物理模型试验 明渠 

分 类 号:U617[交通运输工程—船舶及航道工程] TV74[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象