检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭爽
机构地区:[1]中国城市建设研究院有限公司西安分院,陕西西安710000
出 处:《工程经济》2017年第11期33-35,共3页ENGINEERING ECONOMY
摘 要:PPP项目包括项目识别、项目准备、项目采购、项目执行、项目移交五个阶段,识别是起始阶段,也是关键阶段。以高陵生活垃圾无害化处理工程PPP项目为例,阐述项目识别阶段的物有所值评价方法和评价过程中参数的选取,以及财政承受能力的测算原理、测算方法,为类似PPP项目的开展提供参考。PPP project generally consists of 5 stages:identification,preparation,procurement,implementation and handover.Identification is the initial stage and a crucial stage of PPP project.Taking the Gaoling living garbage harmless treatment project as an example,this paper discusses the evaluation method of value for money and the selection of parameters in the process of project identification,and the calculation principle and methods of financial capacity evaluation involved in the identification stage,in order to provide references for the development of similar PPP projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.224