检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:裴鸿斌[1] 于海申[1] 陈学光[1] 魏鑫 林涛
机构地区:[1]中国建筑第八工程局有限公司天津分公司,天津300450
出 处:《施工技术》2017年第23期103-107,115,共6页Construction Technology
基 金:中建八局科技资助(2014-01)
摘 要:以天津周大福金融中心为工程背景,基坑周边环境复杂,毗邻众多重要建筑物,管线密集且部分管线变形已经达到预警值,同时地处天津软土地区的基坑存在着显著的"时空效应",基坑变形引起的负面影响不言而喻,其是整个工程顺利实施的前提,也是工程成败的关键。In this paper,based on Tianjin CTF Financial Center project,the surrounding environment around the foundation excavation is complex,adjacent to many important buildings,pipeline-intensive and part of the pipeline deformation reaches the early warning value,while located in Tianjin soft soil area there is a significant "space-time effect",the negative impact caused by the deformation of the deep foundation excavation is self-evident,which is the prerequisite for the smooth implementation of the whole project and also the key to the success or failure of the project.
关 键 词:高层建筑 深基坑 变形 支护 抽条开挖 超前支撑 施工技术
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117