检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学机械与动力学院,湖北宜昌443002
出 处:《机械设计》2017年第11期57-62,共6页Journal of Machine Design
基 金:国家自然科学基金资助项目(51475265);三峡大学硕士学位论文培优基金资助项目(2015PY029)
摘 要:产品开发过程中常用的单阶段并行迭代模型要求所有任务并行执行,该要求在实际生产中难以实现。针对这一问题,将单阶段迭代模型与多阶段任务分配思想结合,构建二阶段迭代模型。研究求解该模型的资源最优化配置方法,以得到各任务小组的任务阶段和资源分配的最优化配置情况。将该二阶段迭代模型与资源最优化配置方法运用于某智能割草机的开发中,减少了开发过程所需的时间,从而验证了该模型的有效性。The single phase parallel iteration model which is commonly used in the product development process requires that all tasks are in parallel execution, and the requirement is difficult to implement in practical production. Aiming at this problem, the single phase iteration model was combined with the multi-stage tasks method, and then two-stage iterative model was established. In order to figure out the optimization allocation of each task group′s task phase and the allocation of resources, the resource optimization configuration method to solve the model is researched. The two-stage iteration model and the resource optimization configuration method are applied to the development of an intelligent lawn mower, so the time needed for development is reduced, and the validity of the model is verified.
关 键 词:资源最优化配置 二阶段迭代模型 耦合集 智能割草机
分 类 号:TH122[机械工程—机械设计及理论] TP391[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15