检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋兵[1]
机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830000
出 处:《广西水利水电》2017年第6期50-53,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:以新疆某大型预应力渡槽为研究对象,应用有限元计算软件模拟了预应力渡槽在完建期和运行期的位移和应力情况,通过在槽身底部和侧墙布置肋梁,能够有效提高槽身抗变形能力,经过计算,该渡槽可满足完建期整个槽身不出现拉应力,运行期渡槽底部拉应力小于混凝土的抗拉强度,但支座处局部出现应力集中现象,应当在支座处加密配筋达到抗裂要求。其计算成果可供实际工程设计时参考。For a large pre-stressed aqueduct located in Xinjiang Uygur Autonomous Region, finite element calculation software was used to simulate the displacement and stress during construction completing period and operation period. The deformation resistance ability of aqueduct body can be improved by designing rib beams at the bottom and both sides. The results of calculation demonstrate the whole aqueduct body will not have tensile stress during the completing period; the tensile stress at bottom will be less than the tensile strength of concrete during the operation period; stress concentration will occur locally at the support positions which requirs denser reinforcement to prevent crack.
分 类 号:TV672.3[水利工程—水利水电工程] TP391.9[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117