检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第七工程局成都水电建设工程有限公司,成都611130
出 处:《工程建设与设计》2017年第24期157-159,共3页Construction & Design for Engineering
摘 要:我国城市基础设施建设处于大规模、高速度发展阶段,现浇桥梁在城市轨道交通建设中应用已很广泛,但施工过程中常会遇到超高压线路障碍影响,极大地增加了施工难度及安全风险,甚至无法施工。论文通过工程实例,分析采用合理、安全的防护体系对超高压线下桥梁施工加以防护,可以解决迁改周期长而导致工程延期的难题。China's urban infrastructure construction in the large-scale, high speed development stage, cast-in-place bridge in urban rail transit construction is widely applied, but ultra-high voltage circuitry obstacles may happen in the construction process, it greatly increases the difficulty of construction and security risks, and even lead to can't construction. This paper taking an project example to analyze that adopting reasonable and safe protection system to protect the bridge construction under the ultra-high voltage power lines, can solve engineering problem of delay caused by moving change cycle is long.
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15