两河口水电站冬季土料防控措施研究  被引量:3

Study on Prevention and Control Measures for Soil in Winter,Lianghekou Hydropower Project

在线阅读下载全文

作  者:赵彦辉 

机构地区:[1]中国水利水电建设工程咨询西北有限公司,西安710061

出  处:《西北水电》2017年第6期94-99,共6页Northwest Hydropower

摘  要:两河口水电站地处青藏高原东侧边缘地带,属川西高原气候区,多年平均气温为10.9℃,极端最高温度为35.9℃,极端最低气温为-15.9℃。按照冻土分类属于季节性、短时浅层冻土,无常年冻土。土料碾压后经冻融循环后出现明显胀裂,渗透系数发生了数量级增大,渗透指标已不满足设计要求。根据对不同料场和坝区土料不同深度土层温度与外界气温实测资料的试验分析,表明在表面加盖保温材料后,表层温度变化明显,夏季表层土温降低,冬季表层土温显著升高,保温效果良好。Linghekou Hydropower Project is located at eastern edge of the Qinghai-Tibet plateau, where it belongs to west Sichuan plat-eau climate region. The carryover average temperature is 10. 9℃ ,the extremely maximum temperature is 35. 9℃ and the extremely min-imum temperature is -15.9℃.As per classification of frozen soil, soil here is the seasonal, short-time and shallow one. No year round frozen soil is available. The roller compacted soil after the freeze-thaw cycle obviously cracks because of swelling. The hydraulic conduc-tivity increases in quantity. The conductive index cannot satisfy design requirement. In accordance with test analysis on soil temperatures at different borrow areas and at different depths in dam area as well as outside air temperature measured, the surface temperature changes obviously after the surface is covered with heat insulating materials. The surface temperature decreases in summer and increases in winter. The heat insulating effect is excellent.

关 键 词:砾石土 堆石坝 温度控制 冬季填坝材料 两河口水电站 

分 类 号:TV641[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象