检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国神华能源股份有限公司神东煤炭分公司,陕西榆林719315 [2]神华神东煤炭集团有限责任公司,陕西榆林719315
出 处:《工矿自动化》2018年第1期95-98,共4页Journal Of Mine Automation
摘 要:针对现有选煤厂煤流系统启停车技术存在启停车时间长、耗电量较大的问题,提出了一种选煤厂煤流系统启停车技术优化方案。以同一台变压器供电的煤流系统设备为启动单元,根据变压器负荷率,同一启动单元内设备同时启动或按设定顺序分批启动,且不同启动单元同时启动;人工测定煤流系统各设备无煤时间节点,在此基础上延后3~5s作为设备停车时间节点,按顺煤流方向实现各设备无煤即停。实际应用结果表明,采用优化的启停车技术后,启车时间下降了57.9%,停车时间下降了35.2%,取得了良好的节能效果。For problems of long starting and stopping time and large power consumption existed in current starting and stopping technology for coal flow system of coal preparation plant,an optimization scheme of starting and stopping technology for coal flow system of coal preparation plant was proposed.Equipments of coal flow system powered by the same transformer are taken as starting unit.Equipments in the same starting unit start simultaneously or start in batches in set sequence according to load factor of the transformer,and different starting units start simultaneously.No-coal time node of each equipment of coal flow system is measured manually,and equipment stopping time node delays 3-5 seconds behind the nocoal time node,so as to realize each equipment stopping wihout coal immediately according to direction of coal flow.The actual application results show that starting time reduces 57.9% and stopping time reduces 35.2% by use of the optimization scheme,which achieves good energy-saving effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145