检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭奎
机构地区:[1]江苏金领建设发展有限公司
出 处:《工业设计》2017年第12期120-121,共2页Industrial Design
摘 要:根据钻孔灌注桩施工工艺,桩头的凿除是一道不可避免的施工工序,通常凿除桩头方法是人工风镐凿除清顶。本文针对农溱园连接线桥梁工程施工实践,阐述"摘除法"凿桩头新技术,在加工桩基钢筋笼制作时,在主筋顶端(需凿除桩头的范围)采用聚氨酯发泡剂包裹主筋,成型固态发泡剂包裹直径达主筋直径的3-5倍,在成型固态发泡剂缠绕薄膜套保护,这就实现了桩头部位钢筋与混凝土的分离,该新工艺实现桩头凿除质量可控的情况下,同时节约人工费、机械费、加快施工周期。According to the construction technology of bored piles, pile head chisel in addition is a inevitable construction process, usually chisel in addition to the pile head method is arti?cial pick carved in addition to the top. Based on farmers Qin garden cable bridge project construction practice, this paper /"remove/" new technology of cut pile head, when processing the pile reinforcing cage production, at the top of the main reinforcement (chisel in addition to the scope of the pile head required) using polyurethane foaming agent master jin packages, forming a solid foaming agent package for 3 to 5 times the diameter of the diameter of the main reinforcement, in shaping solid-state foaming agent wrapping ?lm protection, it is realized the separation of steel bar and reinforced concrete pile head part of the new technology of realization of pile head chisel in addition to quality control, at the same time, saving labor, machinery, speed up the construction period.
分 类 号:U445.551[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15