新型注浆钻头施工技术在海岸沉积复杂地层中的应用  被引量:1

Application of New Grouting Bit Technology in Coastal Sedimentary Complex Strata

在线阅读下载全文

作  者:于鹏 王迪 杨忠年[3] 

机构地区:[1]中国海洋大学环境科学与工程学院,山东青岛266000 [2]中交第一航务工程局有限公司,山东青岛266000 [3]青岛理工大学土木工程学院,山东青岛266000

出  处:《施工技术》2018年第1期45-49,共5页Construction Technology

摘  要:注浆钻头的发展一直落后于注浆工艺及浆液材料的发展。介绍了一种新型伸缩式注浆钻头,凭借其特性可实现在大部分土层中、任意深度边钻边注,推荐了配套合理的施工方法、施工顺序和施工参数,成功应用在青岛地铁R3线隧道工程中,缩短了注浆工期。并采用多种方法验证其注浆效果,证明该新型钻头在海岸沉积复杂地层中的适用性。Grouting bit development has lagged behind the grouting process and the development of slurry materials. A new telescopic grouting drill bit is introduced in this paper, it can be realized while drilling edge drilling in most of the soil and any depth by virtue of its characteristics, the reasonable construction method, construction sequence and construction parameters are recommended, successfully applied it in the Qingdao Metro Line R3 tunnel project and shorten the grouting period. The grouting effect was verified by various methods, and proved the applicability of the new drill bit in the complicated sedimentary strata.

关 键 词:隧道工程 注浆 钻头 海岸沉积层 施工技术 监测 

分 类 号:U459[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象