检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530023
出 处:《广西电力》2017年第6期7-12,共6页Guangxi Electric Power
摘 要:广西电网220 kV及以下电网感性无功补偿配备不足,近年来受负荷增速放缓、负荷特性变化以及非统调小水电无功出力难于控制等因素影响,局部地区电网无功过剩、电压过高的问题日益突出。从负荷特性、电网结构、无功资源、设备运行等方面分析了广西局部电网无功过剩、电压过高的原因,提出配置220 kV变电站低压电抗器、合理调配220 kV及以下电网电容器配置比例、应用动态无功补偿等措施,有效改善了广西电网无功电压问题。The reactive power compensations are insufficient in 220 kV and below power grid in Guangxi power grid. Influenced by factors including slowing load growth, changing of load characteristic and difficult controlling of reactive output of uncontrolled small hydropower, problems such as reactive power surplus and over-high voltage and so on are becoming more and more serious in some regional power grid. Reasons of reactive power surplus and over--high voltage in Guangxi regional power grid are analyzed from aspects of load characteristics, power gird structure, reactive power resources and equipment operation and so on. Measures are proposed including allocation of low voltage reactor in 220 kV substation, reasonable adjustment & allocation of capacitor allocation ratio in 220 kV and below power grid and application of dynamic reactive power compensation, which effectively improves the reactive power and voltage problems in Guangxi power grid.
分 类 号:TM761.12[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127