检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网浙江玉环县供电公司,浙江台州317600 [2]天地电研(北京)科技有限公司,北京102206
出 处:《湖北电力》2017年第11期51-58,共8页Hubei Electric Power
摘 要:针对配电线路杆塔基础常因地质条件、基础空间等因素限制无法实施的问题,分析了换土垫层和换填法在架空配电线路现浇台阶式基础中的应用,通过分析发现:利用换土垫层法可以有效提高地基承载力,减小配电网杆塔混凝土台阶式基础的尺寸,从而降低施工难度,并能够有效降低工程造价,具有可观的经济效益。When constructing the tower foundation of distribution lines,due to geological condi-tions, basic space and other factors, the construction is unable to be implemented sometimes. Inthis paper, the application of soil replacement cushion method in benched foundation of overheaddistribution lines has been analyzed, it's been found that subgrade bearing capacity could be im-proved effectively by use of soil replacement cushion method, the size of concrete benched founda-tion of power tower could be decreased and difficulty of construction could be reduced as well. Andthis could exploit its economic benefits.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222