煤矿掘进工作面临时支护装置工作阻力的设计研究  被引量:11

Design and Research on Working Resistance of Temporary Support Device in Coal Mine Working Face

在线阅读下载全文

作  者:郭文孝 李瑞琴[3] 

机构地区:[1]中国煤炭科工集团太原研究院有限公司,太原030006 [2]山西天地煤机装备有限公司,太原030006 [3]中北大学机械与动力工程学院,太原030051

出  处:《煤炭技术》2018年第1期16-19,共4页Coal Technology

摘  要:通过在掘进工作面迎头顶锚杆安装测力计进行现场压力观测,运用普氏理论的计算方法确定掘进工作面临时支护装置的工作阻力,采用FLAC3D数值模拟软件,建立掘进巷道三维数值模型,对巷道进行三维动态掘进支护模拟分析,从而验证了掘进面临时支护装置工作阻力可靠,能够保证掘进工作面顶板的稳定。Through the head bolt installation dynamometer is greeted in the tunneling faces the pressure observation, by using the theory of the M, M. Promo Jiyfakonov,the calculation method of determine the working resistance of tunneling face temporary support device,using FLAC3D numerical simulation software, three dimensional numerical model for the roadway drivage build, three-dimensional dynamic excavation supporting simulation analysis was carried out on the roadway, which verifies the tunneling face when supporting device working resistance, reliable and can ensure the stability of tunneling working face roof.

关 键 词:普氏理论 临时支护装置 工作阻力 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象