检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省电力勘测设计研究院,石家庄050031
出 处:《河北电力技术》2017年第6期39-41,51,共4页Hebei Electric Power
摘 要:针对寒冷地区的气候特点,通过四个方面对预制舱舱体结构进行优化设计:首先,对预制舱外壁进行热力学建模分析,通过对比选择岩棉板作为预制舱保温材料,并经傅里叶热传导定律计算合理选择保温材料厚度;其次,考虑在极寒状况下空调制热模式启动困难,选择电加热膜作为热量补偿器,保证极寒温度下光纤熔接的正常施工;再次,优化设计预制舱屋顶,采用电伴热带实现预制舱屋顶的自动融雪功能;最后,推荐预制舱内设置集中接线屏,底部进线方式,避免"冷桥"现象。According to the climate characteristics,optimizes the design of the prefabricated cabin structure in four aspects.First,the thermal modeling of the outer wall of the prefabricated cabin is carried out.Through comparison,the rock wool board is selected as the insulation material of the prefabricated cabin,and the thickness of the insulation material is reasonably selected by the Fourier heat equation.Secondly,in the extreme cold condition,it is difficult to start the air conditioning heating mode,and the electric heating screen is selected as the heat compensator to ensure the normal construction of the optical fiber welding under the extremely cold temperature.Thirdly,the roof of prefabricated cabin is optimized,and the automatic snow melting function of prefabricated cabin roof is realized by adopting electric heating belt.Finally,it is recommended that the centralized wiring panel and the bottom line approach be installed in the prefabricated cabin to avoid the "cold bridge" phenomenon.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15