电厂准时制服务系统的设计与实现  

Just-In-Time service system for power plant

在线阅读下载全文

作  者:张琦[1] 

机构地区:[1]哈尔滨铁路局信息技术所,哈尔滨150006

出  处:《铁路计算机应用》2018年第1期51-54,58,共5页Railway Computer Application

摘  要:自实施货运组织改革以来,哈尔滨铁路局积极引入电煤"准时制"运输方式,形成供应链一体化管理,实现合作共赢。为了更好地给电厂及煤炭企业提供优质服务,哈尔滨铁路局利用信息化技术设计与开发了电厂准时制服务系统。电厂准时制服务系统采用Blaze DS框架设计,利用铁路计算机安全平台,通过互联网安全访问本系统;达到了降低企业生产成本,提高铁路局收入的目的。Since the implementation of the freight reform, Harbin Railway Administration has actively introduced electric coal "just in time" transport mode, formed integrated supply chain management, and achieved win-win cooperation. In order to provide better service for the users of the power plant and coal enterprise, Harbin Railway Administration used the information technology to design and develop the Just-In-Time(JIT) service system for power plant. The system was designed by BlazeDS framework, safely accessed by railway computer security platform through the Internet. It achieved the goal that the system reduced the cost of enterprise production and improved the income to Harbin Railway Administration.

关 键 词:BLAZEDS 电厂 准时制 

分 类 号:U294.1[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象