检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油化工集团公司中原油田分公司采油气工程服务中心,河南濮阳457000
出 处:《化工设计通讯》2018年第1期90-90,共1页Chemical Engineering Design Communications
摘 要:在有杆泵检修过程中,发现泵上油管断脱后,按照正常程序即先起杆,后起管的顺序进行施工作业,结果造成了抽油杆尼龙扶正器被挂落井,井筒情况变得复杂化,后续需要先多次打捞扶正器清理鱼顶,再打捞油管柱,打捞难度加大,施工周期延长,施工费用增加;针对此种情况,在中原油田文38-63井探索出了一套新的技术和操作方法,避免了井筒情况复杂化,为以后同类井作业提供了经验。During the overhaul of the rod pump, it was found that after the oil pipe on the pump was broken off, construction work was performed according to the normal procedures of starting the rod first and then raising the tube.As a result, the nylon centralizer of the sucker rod was dropped, The wellbore situation becomes complicated.In the follow-up, it is necessary to recycle the centralizer to clean the top of the fish several times and then to salvage the tubing string, which makes it more difficult to salvage and the construction period is extended and the construction cost is increased.ln view of this situation, Explored a new set of techniques and methods of operation to avoid complicated borehole conditions and provide experience for similar well operations in the future.
分 类 号:TE933.3[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66