检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《水力发电》2018年第2期62-65,共4页Water Power
摘 要:新疆阿尔塔什水利枢纽工程大坝趾板基础为软岩,岩石极为破碎,裂隙较为发育,基础开挖成形困难。施工过程中,通过合理的分区分层和爆破设计,保证了趾板基础成形质量,为后续趾板浇筑、灌浆、大坝填筑提供了有利的施工条件。详细介绍了阿尔塔什大坝趾板基础开挖的施工方法。The rock in dam toe slab foundation of Aertashi Water Control Project in Xinjiang is soft rock. The rock is extremely broken and the fractures are relatively developed, so the foundation excavation is difficult to take shape. During construction process, the shape of toe slab foundation is guaranteed by rational zoning, layered and blasting design, which provides favorable construction conditions for subsequent toe slab pouring, grouting and dam filling. The construction method of toe slab foundation excavation of Aertashi Dam is introduced in detail.
关 键 词:面板堆石坝 趾板 开挖 阿尔塔什水利枢纽工程
分 类 号:TV551.4[水利工程—水利水电工程] TV641.43
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222