检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李长更 刘友宽 LI Changgeng;LIU Youkuan(Yunnan Electric Power Test & Research Institute (Group) Co., Ltd., Kunming 650217, China)
机构地区:[1]云南电力试验研究院(集团)有限公司,昆明650217
出 处:《云南电力技术》2017年第6期81-83,共3页Yunnan Electric Power
摘 要:通过对双进双出磨煤机启停过程各阶段进行分析,总结出解决双进双出磨煤机启停过程对协调控制系统影响的方法。通过对双进双出磨煤机启停过程中测量的容量风量进行逻辑处理,模拟该型磨煤机启停过程,可减小该过程中无效容量风量对机组协调控制系统调节效果的影响,保证了火电机组负荷变动、磨煤机投切过程中的主参数稳定性。Based on the analysis of the start and stop process of the double inlet and double outlet coal mill, this paper summarizes the method to solve the influence of the start and stop process of the double inlet and outlet coal mill on the coordinated control system.. Through logic optimization of primary air volume in the process of starting and stopping of the double inlet and outlet coal mill, the start and stop process of the coal mill is simulated, reduced the effect of the air volume on the control effect of the unit coordinated control system, ensured the stability of the main parameters of the thermal power unit in the process of load variation and the coal mill start and stop process.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145