东峰煤矿3号煤层工作面顺槽支护方案优化  

Optimization of crossheading support scheme of mining face in No.3 coal seam in Dongfeng Coal Mine

在线阅读下载全文

作  者:张恩强[1] 司红勇 杨开放 毋凡 吴蒸[1] 

机构地区:[1]西安科技大学能源学院,陕西西安710054 [2]山西兰花集团东峰煤矿有限公司,山西晋城048000 [3]山西兰花科创玉溪煤矿有限责任公司,山西沁水048000

出  处:《陕西煤炭》2017年第4期1-4,16,共5页Shaanxi Coal

摘  要:针对东峰煤矿3号煤层工作面顺槽过度支护问题,采用相似模拟实验、数值模拟和工程试验等方法,对支护方案进行了研究,确定了单排锚索偏心布置的锚杆锚索联合支护的优化方案。该方案节省了工程量和成本,提高了效率和效益。这对完善支护设计理论和进行支护改革实践具有重要的现实意义。In view of the over-support problem of mining roadway in No. 3 coal seam in Dongfeng Coal Mine,by using the similar simulation experiment,numerical simulation and engineering test,the support scheme was optimized,and the bolt and cable combined support scheme of the eccentric arrangement of single row anchor cable was proposed. The scheme saves engineering quantity and cost as well as improves efficiency and benefit. The study has great practical significance to improve the support design theory and supporting reform practice.

关 键 词:锚杆支护 过度支护 支护方案优化 数值模拟 物理相似模拟 

分 类 号:TD355[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象