检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘瑞强
机构地区:[1]中国葛洲坝集团基础工程有限公司,湖北宜昌443002
出 处:《红水河》2018年第1期29-31,共3页Hongshui River
摘 要:为满足高地震区结构安全需要,弧形闸门支铰梁与启闭机泵站闸房梁通过后墙相连接呈整体,形成超大断面深梁结构形式。该结构采用构造简单、经济合理、施工方便的钢结构支撑排架。为保证深梁施工顺利进行,经过受力分析计算,选择合适的施工参数,并在施工过程中采取有效的安全监测、混凝土分层浇筑等技术措施,落实模板起拱、承重排架拆除等相关规范规定,消除安全风险,保证了施工质量。In order to ensure the structure safety in high seismic region deep trunnion beam of radial gate and brake beam ofhoist pumping station are connected with the rear wall to form a deep beam structure with a super-large section. The structureis of steel bent frame with simple structure economical cost and convenient construction. The suitable constructionparameters are selected through force analysis and calculation to ensure the smooth construction of deep beam. Furthermore the effective technical measures for monitoring safety pouring concrete and others are adopted in the construction process meanwhile the relevant specifications and regulations on template arching bearing bent removal etc. are implemented so asto ensure the construction quality and eliminate safety risk.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117