检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学机械与动力学院
出 处:《机械设计与研究》2018年第1期172-176,共5页Machine Design And Research
基 金:国家自然科学基金资助项目(51475265)
摘 要:针对产品开发中任务工期的不确定性,运用三点估计法估算任务工期的正态分布曲线和置信区间,并结合二阶段迭代模型,建立工期不确定条件下具有资源最优配置特性的耦合集求解模型,通过求解该模型得出在最佳的任务分配和资源分配情况下任务完成时间的分布情况。该方法通过某门座起重机变幅系统的开发实例应用分析进行了有效验证,能为实际产品开发提供一定的指导依据。Aiming at the uncertainty of task duration in product development, the normal distribution curve and the confidence interval of task duration are estimated by using the three-point estimating method. The coupled set solving model with resource optimization configuration properties is established with the two-stage iterative model. The distribution of task completion time under the condition of optimal allocation of tasks and resources is obtained by solving this model. The method is effectively verified in the development of a portal crane' s luffing system, and it can provide a guidance for the practical product development.
关 键 词:产品开发 任务工期 不确定条件 资源最优配置 二阶段迭代模型
分 类 号:TH122[机械工程—机械设计及理论] TP391[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15