检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学测地学院,甘肃兰州730070 [2]甘肃铁道综合工程勘察院,甘肃兰州730000
出 处:《测绘通报》2018年第1期88-91,124,共5页Bulletin of Surveying and Mapping
基 金:国家自然科学基金(41574009)
摘 要:为了减少东西走向长线工程中的控制点数据在进行高斯投影转换时需要频繁换带的问题,提出了一种方法,即以工程线路中心线或其附近的大椭圆线为中央子午线,建立大椭圆线椭球,根据非线性规划最优理论求出大椭圆线椭球参数,并对其进行椭球变换,然后以此新椭球为基础进行高斯投影。In order to reduce the problem of projection band transformation of the control point data in the east-west long projective engineering when Gaussian transformation is performed, the paper proposes to establish a large elliptical ellipsoid with the large elliptical line near the center line of the engineering line or its neighborhood. The large elliptic ellipsoid parameters are obtained according to the nonlinear programming optimal theory and ellipsoid transformation is finished, and then the Gauss projection is based on the new ellipsoid.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229