机构地区:[1]南瑞集团公司(国网电力科学研究院),江苏省南京市211100
出 处:《水电与抽水蓄能》2017年第6期44-47,11,共5页Hydropower and Pumped Storage
基 金:水利部土石坝破坏机理与防控技术重点实验室开放基金资助项目(YK915007)
摘 要:本文基于原型监测,通过沉降、水平位移两个方面分析某抽水蓄能电站施工期上库主坝内部变形情况。分析结果表明,主坝自2014年10月以后沉降速率均已达到设计控制指标,沉降量和水平位移量均不大。与一般面板堆石坝相比,沉降和水平位移变形规律略有差异,由于受坝基地形倾向下游的影响,上水库主坝施工期最大沉降位置靠近下游,水平位移也整体向下游变形。This article is based on prototype monitoring to analyze internal deformation of a pumped storage power station during the construction period in two aspects, horizontal displacement and vertical displacement. The results of analysis show that the settlement rate of the dam has reached the design demandsin October 2014, and the deformation values are small.Compared with the general concrete face rockfill dam, the horizontal and vertical displacement is slightly different.Because of the influence of the terrain, the maximum settlement position of the dam is close to the downstream, and the horizontal displacementis also deformed downstream.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117