检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:顿小宝[1] 张瑞祥[1] 叶志强 赵峰[2] 彭伟超
机构地区:[1]西安热工研究院有限公司,陕西西安710000 [2]华能山东石岛湾核电有限公司,山东威海264200
出 处:《中国给水排水》2018年第4期119-122,共4页China Water & Wastewater
摘 要:核电站调试较常规电厂有着明显区别,简要介绍了某核电站除盐水处理系统工艺流程、调试过程,详细描述了调试过程中出现的问题,如SDI不合格、产生虹吸现象、管道位置不合理等,提出了包括确定细砂规格、增加背压阀、改变阀门位置及优化设计等解决方案,验证了方案的可行性,可为同类系统提供参考。The commissioning of a demineralized water system in a nuclear power plant is marked- ly different from that in the conventional power plant. The technological process and commissioning process of the demineralized water system in a nuclear power plant were briefly introduced. The problems in the commissioning process were described in detail, including unqualified silt density index, siphon- age, and the controversial pipeline positions. The proposed solutions, including specified fine sand size, adding back pressure valves, valve position adjustment and design optimization, were validated and can be used as a reference for similar system. .
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145