检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚瑞虎 李深奇 覃光华[1,3] 丁晶[1] 曹泠然 李品良
机构地区:[1]四川大学水利水电学院,四川成都610065 [2]四川省水利水电勘测设计研究院,四川成都610065 [3]水力学与山区河流开发保护国家重点实验室,四川成都610065
出 处:《水文》2018年第1期1-6,13,共7页Journal of China Hydrology
基 金:国家重点研发计划资助项目(2016YFC0401903);国家自然科学基金资助项目(51679155)
摘 要:提出特定洪水过程的新概念及其内涵,论述了工程防洪标准的形式意涵和实质意涵,引出特定洪水过程与防洪标准之间的联系——洪水过程形式频率新概念。阐述特定洪水过程的三种蜕变类型及其推求方法。指出当前推求特定洪水过程的同倍比和同频率法优缺点,最后简述了新推求方法的基本思路。According to the study on flood hydrograph, the new concept of specific flood hydrograph and its connotation were pro- posed. Meanwhile, the external and essential implication of engineering flood prevention standard were expounded. And then the re- lationship that was the new concept of external frequency of flood hydrograph between specific flood hydrograph and flood preven- tion standard was drawn. The specific flood hydrograph of three types of transformation and its calculation method were elaborated. The advantages and disadvantages of the common multiple method and the common frequency method of specific flood hydrograph were pointed out. A brief introduction about the basic idea of new calculation method of specific flood hydrograph was given.
关 键 词:特定洪水过程 洪水风险度 防洪安全标准 形式频率 年最高水位
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.137.236