检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:童亮[1]
机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830000
出 处:《广西水利水电》2018年第1期40-42,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:结合米兰河山口水利枢纽导流兼泄洪排砂洞的实际情况和工程地质条件,分不同洞段进行了设计,对运行中易造成空蚀破坏部位和排砂时易泥沙磨损部位采取了相应的工程措施,完建后,连续运行2年多,导流洞在各种工况下均能安全运行,证明设计科学合理。Shankou Hydraulic Complex on Milan River is designed with a tunnel used for diversion, flood discharge and sediment flushing. Design was conducted according to the actual status and engineering conditions of various tunnel sections. For the tunnel sections liable to have cavitation or silt abrasion, corresponding engineering measures were designed. This project has been operating safely for more than 2 years since the construction was completed, which demonstrate the rationality of design.
分 类 号:TV651.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31