煤矿建设项目的大气环境影响评价——以某热电厂开发项目为例  被引量:2

Atmospheric Environment Impact Assessment of Coalmine Construction Project——A Case Study of the Development Projects of a Thermal Power Plant

在线阅读下载全文

作  者:普劲松 喻润梅[2] 

机构地区:[1]武汉市环境保护科学研究院,湖北武汉430015 [2]湖北轻工职业技术学院,湖北武汉430070

出  处:《科技创新与生产力》2018年第1期67-69,共3页Sci-tech Innovation and Productivity

摘  要:以某热电厂开发项目为例,介绍了煤矿建设热电厂前大气环境影响评价的方法,包括大气环境质量的现状监测与评价、大气环境影响预测和评价及相应的环保措施建议,并指出了煤矿建设热电厂时需要重点做好每时质量浓度及日均质量浓度的预测等几项工作,以及时预防该地区可能发生的环境污染情况。Taking the development projects of a thermal power plant as the example, this paper introduces the evaluationmethod of atmospheric environment impact before the construction of coal power plant, including monitoring and evaluation ofatmospheric environmental quality, prediction and evaluation of atmospheric environmental impact, and some corresponding sug-gestions and environmental protection measures. Finally, it points out several work that need to be done in the construction ofthermal power plant in coal mine, so as to prevent possible environmental pollution.

关 键 词:大气环境评价 环境影响 大气污染 煤矿热电厂 

分 类 号:X823[环境科学与工程—环境工程] TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象