检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兖州煤业股份有限公司东滩煤矿,山东邹城273512
出 处:《土工基础》2017年第6期697-701,共5页Soil Engineering and Foundation
摘 要:深部煤层受采动影响顶板破碎,开挖过程中容易出现较大的顶板下沉,严重影响巷道的施工安全。以东滩煤矿143下04(西)顺槽为研究对象,通过计算分析,研究了微拱支护作用机理。起拱高度对棚梁的变形和受力具有重要影响,顶板下沉随着拱高的增大而减小,棚梁的轴力和弯矩随着拱高的增大而增大,结合东滩煤矿实际情况,确定了最佳起拱高度为15cm,并提出了相应的支护参数和施工方案。微拱支护的现场应用表明,采用微拱支护后,巷道的顶板下沉量较小,且很快趋于稳定,验证了该支护方案的合理性。When mining in the deep buried coal seams,the roof of the excavated gallery is usually broken due to the effect of the coal extraction.The broken roof could result in a safety hazard to the safe of the gallery construction.This paper presents the numerical analysis results on the effect of the camber arch support on the stability of the coal extraction galleries using the case history of 143 down04 gallery in Dongtan Coal Mine.The results indicate that height of the camber arch has a significant impact on the deformation and stresses in the supporting system.The settlement at the gallery roof decreases with the increase of the camber arch height,but the axial stress and the bending moments in the roof beam increase.The optimized arch height in the case history was determined to be 15 cm.The other parameters for the supporting design was also determined.The settlement observed in the coal roof supported by the camber arches were reduced and the settlement was stabilized in a short period of time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30