检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国中铁二院工程集团有限责任公司通信信号设计研究院
出 处:《铁道通信信号》2018年第2期22-25,28,共5页Railway Signalling & Communication
摘 要:以兴国站改造工程为例,介绍信号过渡的设计原则,重点探讨全直流转辙机车站增加三相交流转辙机的信号过渡方案;提出了既有信号楼增加三相交流电源屏和临时使用直流转辙机过渡的2种方法,并从施工难度、投资预算等多方面,分析2种方法的优缺点以及适用性,对其他类似工程具有参考意义。Taking the reconstruction project of Xingguo station as an example, the design princi ple of the transitional plan of the signal system is described and comparative discussion is focused on transitional schemes of the signal system in which three-phase AC switch machines will be added to the existing station with DC switch machines. Two transitional schemes of the signal system are proposed, one with AC power supply panel added to the signal tower and the other with temporary DC switches. The advantages, disadvantages and applicability of the two schemes are analyzed, offering reference for other similar projects.
关 键 词:信号过渡设计 三相交流转辙机 直流转辙机 道岔表示
分 类 号:U284.92[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63