深部大变形巷道应力缓释与围岩加固联合支护技术研究  被引量:3

Study on Joint Support Technology of Stress Release and Surrounding Rock Reinforcement in Deep and Large Deformation Roadway

在线阅读下载全文

作  者:徐光[1] 徐斌[1] 曲延伦[1] 李农[1] 

机构地区:[1]兖州煤业股份有限公司东滩煤矿,山东邹城273500

出  处:《煤矿现代化》2018年第3期93-96,100,共5页Coal Mine Modernization

摘  要:深部矿井大变形巷治理对于煤矿的安全生产至关重要。针对东滩煤矿深部开采过程中遇到巷道大变形问题,首先开展巷道围岩微观试验,研究其大变形产生的内在机理,并采用探地雷达和钻孔摄像技术,测定大变形巷道松动圈范围,为支护方案设计提供依据。随后在现有支护方案的基础上,提出应力缓释与围岩加固相结合的联合支护方案,该支护方案在东滩煤矿北轨大巷现场应用表明,应力缓释与围岩加固相结合的支护方案,可以很好的控制巷道顶底板和两帮的大变形,具有良好支护效果。The treatment of large deformation roadway in deep mine is very important to the safety production of coal mine. Aiming at the problem of large deformation of roadway in the deep mining process of Dongtan coal mine, the micro test of surrounding rock of roadway is carried out first. The internal mechanism of large deformation is studied, and the range of loose ring of large deformation roadway is determined by using ground penetrating radar and borehole camera technology, which provides the basis for the design of support scheme,then on the basis of the existing support scheme. This paper puts forward a combined support scheme which combines stress slow release with surrounding rock reinforcement. The application of this support scheme in Dongtan coal mine north track roadway shows that stress slow release combined with surrounding rock reinforcement is a support scheme. It can control the roof and bottom of the roadway well. The large deformation of the plate and the two groups has a favorable supporting effect.

关 键 词:高地应力 应力释放 巷道支护 地质雷达 钻孔摄像 

分 类 号:TD322[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象