检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安石油大学石油工程学院,陕西西安710065 [2]中国石油长庆油田分公司油气工艺技术研究院,陕西西安710079 [3]中国石油长庆油田分公司第二采气厂,陕西西安710200
出 处:《油气藏评价与开发》2018年第1期49-53,共5页Petroleum Reservoir Evaluation and Development
基 金:国家自然科学基金资助项目"基于采动影响条件下煤层气数值模拟方法研究"(51404196)
摘 要:天然气从井口到处理厂的流动过程中,由于流程中温度和压力等不断变化,可能出现部分凝析水,造成输送效率下降。子洲气田集气站采用"小站常温分离、湿气气相输送、处理厂集中脱烃脱水"的工艺模式,其中常温分离的方法,需要通过水露点的研究确定凝析水产生的部位,明确不同工况下合理的集气站运行温度,提高集气站分离效率。利用自研的水露点测试仪对子洲气田(洲1、洲4、洲8)集气站外输部分取天然气进行不同压力下水露点测试,建立了水露点—压力的指数预测模型,进而建立了水露点与含水量的关系方程。子洲气田洲4站数据计算表明,该站夏季凝析水主要出现在外输到接收站的管道中,日产凝析水量约8 m^3,冬季时站内就出现了凝析水,从外输端到接收站的凝析水量少于夏季,但外输到接收站的管道中仍有一定量的凝析水出现,矿场外输压降和清出积液量随日期变化曲线说明了该次计算结果是比较可靠的。根据该次带压条件下水露点预测可计算的集气站管线日产水量,为现场措施清管提供有力指导,减少了管线运行阻力。In the process of the natural gas flowing from the well head to the treatment plant, some condensate water may be produced and the transport efficiency declines due to the constant changes of the temperature and the pressure. The gathering stations of the Zizhou gas field adopt the technological process of the single station with the separated water and gas at the room temperature, the moisture vapor transport, and the hydrocarbon and dehydration took off together in the treatment plant. The separation of the water and gas at the room temperature need to determine where the condensate is by analyzing the water dew point, and ensure the rea- sonable running temperature under the different working conditions, so as to improve the separation efficiency of the gas station. By thewater dew point tester developed independently, the water dew point test was carried out under different pressure of the natural gas from the gas gathering stations in Zizhou gas field, that is, Zhou- 1 station, Zhou-4 station and Zhou-8 station, and the index pre- diction model of the water dew point and pressure was established, and then, the equation of the water dew point and water content was established. The calculation results of Zhou-4 station show that the condensate water of this station mainly appears in the pipe- lines which connect the outside to the inside of the station in summer. The daily production of the condensate water is about 8 m3. While in winter, the condensate water appears within the gas gathering stations and the amount of which appears in the pipelines is less than that in summer, but still exists. The pressure drop and the discharge volume changed with the date show that this calcula- tion is more reliable. The daily water production of the gathering station by the water dew point under the pressure provide the effec- tive measures for the pigging in field and reduce the running resistance of the pipeline.
分 类 号:TE832[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7