7m采高7LS8采煤机升级改造设计  被引量:10

Upgrading design of 7LS8 Shearer with 7 m mining height

在线阅读下载全文

作  者:贠瑞光[1] 

机构地区:[1]天地科技股份有限公司上海分公司,上海200030

出  处:《矿山机械》2018年第3期5-8,共4页Mining & Processing Equipment

摘  要:针对一些煤炭生产企业提出对7 m采高7LS8采煤机升级改造的要求,分析了7LS8采煤机主要结构特点和技术参数,给出了7LS8采煤机增大采高的总体思路,确定了7LS8采煤机升级改造后能够达到的最大采高,提出了7LS8采煤机具体的升级改造方案,有针对性地制定了保证升级改造后整机可靠性的相关措施。In view of the upgrading requirements proposed by some coal production enterprises for 7LS8 shearer with 7 m mining height, the paper analyzed the main structure and technical parameters of 7LS8 shearer, and then offered the overall thinking of increasing the mining height of 7LS8 shearer. In addition, it determined the maximum mining height of the ungraded 7LS8 shearer, and proposed the specific upgrading scheme of 7LS8 shearer. It also laid down some measures to guarantee the reliability of upgraded shearer.

关 键 词:7LS8采煤机 升级改造设计 增大采高 可靠性措施 

分 类 号:TD421.6[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象