检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省水利水电科学研究院,广东省水动力学应用研究重点实验室,广东广州510635
出 处:《广东水利水电》2018年第1期24-25,31,共3页Guangdong Water Resources and Hydropower
摘 要:消能工的消能设计对于下游河床的安全有着重要影响,当消力池下游连接斜坡段形成尾坎自由出流时,其消能计算方法尚不完善。根据龙洞水库安全鉴定实例,针对其溢洪道消力池尾坎自由出流的情况进行了消能复核计算分析,可为类似工程提供一定的参考和借鉴。The energy dissipation design of the energy dissipator has an important influence on the safety of the downstream river bed. When the downstream part of the stilling pool connects the slope section to form the free flow of the tail dam,the energy dissipation calculation method is not perfect. According to the safety appraisal case of Longdong Reservoir in Guangzhou City,the energy dissipation check calculation and analysis is carried out for its spillway stilling basin tail dam free flow situation,which can provide some references for similar projects.
分 类 号:TV653.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222