检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学海岸和近海工程国家重点实验室,辽宁大连116024
出 处:《港工技术》2018年第1期6-10,共5页Port Engineering Technology
基 金:国家自然科学基金(51309049)
摘 要:为确定沿海集装箱港区集疏运道路立交节点建设时机,本研究通过构建集疏运道路节点交通量预测仿真模型,分析港区吞吐量与集疏运道路各节点交通量的关系,将交通量预测结果作为集疏运道路节点微观仿真模型的输入,输出各节点的车辆平均延误时间、最大排队长度以及服务水平等指标,对比各节点在不同建设时机决策下的指标值,确定港区集疏运道路立交节点的建设时机,为有效缓解交叉节点车辆拥堵、提高集疏运车辆通行效率提供理论依据。In order to determine proper occasion of constructing overpass joints in the transport system of coastal container harbor, a simulation model has been built to forecast the traffic volume at the above joints, analyze the relationship between the throughput capacity of harbor and the traffic volume at the road joints. The traffic volume forecast results serve as input data and the micro-simulation model outputs such indexes as average delay time for the vehicles at different joints, the maximum length of vehicle queue and service level etc. The construction occasion of overpass joints in the harbor transportation can be determined by comparing the joint indexes under different construction-occasion policies. This research result provides a theoretical basis for alleviating traffic congestion at interchange joints and improving the traffic efficiency of the port transport system.
关 键 词:港口集疏运 立交节点 建设时机 仿真 港口 港口工程 港口开发
分 类 号:U651[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15