检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈伟 孙瀚[1] 王铁力 陈立冬 CHEN Wei, SUN Han, WANG Tie-li, CHEN Li-dong(Jiangsu Surveying and Design Institute of Water Resources Co. ,Ltd., Yangzhou 225127, Jiangsu Province, Chin)
机构地区:[1]江苏省水利勘测设计研究院有限公司,江苏扬州225127
出 处:《中国农村水利水电》2018年第3期99-104,共6页China Rural Water and Hydropower
摘 要:结合泰兴市四桥闸站工程,通过对工程初始方案与改进方案的数值模拟,分析了两种方案进水池内的流态。数值模拟结果表明:在设计流量下,(1)初始方案穿堤涵洞与泵站进水池连接形成侧向进水时,进水池内产生漩涡等不良流态,影响水泵安全稳定运行。(2)改进方案通过增加过渡段,改变了穿堤涵洞与进水池的连接方式,形成正向进水,进水池内无漩涡等不良流态,可以确保水泵安全稳定运行。Based on the numerical simulation of the initial scheme and the improvement scheme of Taixing Siqiao combined sluice-pump station, this paper analyzes the pumping station intake sump flow patterns of the two schemes. The numerical simulation results show that: (1) The initial scheme flow of the pumping station intake sump appears side-direction, and the vortex and other bad flow patterns are generated in the intake sump, which affects the safe and stable operation of the pump. (2) The improvement scheme increases the transition section, which supplies the front inflow. And there are no vortex and other bad flows, so the pump can operate safely and stably.
分 类 号:TV222.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28