基于改进预泄能力约束法的水库汛限水位分期动态控制域确定及应用  被引量:12

Research and application of staged dynamic controlling domain of limited reservoir water level in flood season based on the improved pre-discharge capacity constrained method

在线阅读下载全文

作  者:任明磊[1,2] 何晓燕[1,2] 丁留谦[1,2] 王海军 李辉[1,2] 谭亚男[1] REN Minglei1,2, HE Xiaoyan1,2, DING Liuqian1,2, WANG Haijun3, LI Hui 1,2, TAN Ya'nan 1(1. China Institute of Water Resources and Hydropower Research, Beijing 100038, China ; 2. Research Center on Flood and Drought Reduction, IWHR, Belting 100038, China ; 3. The Mornitoring Center of the Soil and Water Conservation, the Ministry of Water Resources, Beijing 100055, Chin)

机构地区:[1]中国水利水电科学研究院,北京100038 [2]水利部防洪抗旱减灾工程技术研究中心,北京100038 [3]水利部水土保持监测中心,北京100055

出  处:《中国水利水电科学研究院学报》2018年第1期16-22,共7页Journal of China Institute of Water Resources and Hydropower Research

基  金:国家自然科学基金青年基金项目(51509268);中国水利水电科学研究院科研专项(JZ0145B022017)

摘  要:汛限水位动态控制域是水库汛限水位动态控制研究的关键内容,亦是动态控制方案实施的基础。预泄能力约束法是确定汛限水位动态控制域的主要方法,但该方法主要考虑洪水预报信息进行预蓄预泄,并不适用于洪水汇流速度快、依据洪水预报信息决策时效短的水库,因此,本文提出了考虑未来48 h降雨预报信息的改进预泄能力约束法,并结合水库分期汛限水位,研究了水库汛限水位分期动态控制域确定方法。以山西省漳泽水库为例,结合现有分期汛限水位,采用改进预泄能力约束法确定了水库汛限水位分期动态控制域,成果在2013—2016年的水库调度实践中取得了较好的应用效果。Dynamic controlling domain of limited reservoir water level in flood season is the key content ofthe research of dynamic control of limited reservoir water level in flood season,and also is the foundationof implementing the scheme for dynamic controlling. Pre-discharge capacity constrained method is the mainmethod for determining the dynamic controlling domain of limited reservoir water level in flood season,how-ever,this method mainly considers flood forecasting information in the procedure of pre-storage and pre-dis-charge,and does not applicable for the reservoirs with short flow concentration time and low accuracy offlood forecasting scheme. Therefore, this paper proposes the improved pre-discharge capacity constrainedmethod which considers 48-hours rainfall forecasting information,and studies on the determining method ofstaged dynamic control domain of limited reservoir water level in flood season. On the basis of the meth-od,Zhangze Reservoir in Shanxi province is considered as engineering background,and by combining withexisting staged limited reservoir water level in flood season, the improved pre-discharge capacity con-strained method is adopted to determine the staged dynamic control domain of limited reservoir water levelin flood season for Zhangze Reservoir. The achievement has been approved by the Haihe River Water Con-servancy Commission, and achieved preferable application result in the practice of reservoir operation of2013,2014,2015 and 2016.

关 键 词:改进预泄能力约束 汛限水位动态控制域 分期 

分 类 号:TV697.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象