检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟力 梅明荣[1] MENG Li;MEI Mingrong(College of Mechanics & Materials, Hohai University, Nanjing 210098)
出 处:《水力发电学报》2018年第3期11-17,共7页Journal of Hydroelectric Engineering
基 金:国家自然科学基金(11132003)
摘 要:ANSYS优化方法对不同的问题有着不同的计算效率。首先以弹性力学半圆环温度应力为例,研究在不同内半径下,圆环温度应力最小的优化问题。通过设置三组初始温度来比较不同优化方法的精度和收敛性,计算结果表明:零阶法+一阶法的组合优化效果最好。以此为基础结合建立拱坝封拱温度优化计算模型,选取三种方法进行求解,计算表明上述组合法可以得到拱坝最优封拱温度,在特定条件下零阶法也能满足要求。The ANSYS optimization methods have different computational efficiency for different problems. In this paper, the temperature stress of semi-circular ring in elastic mechanics is taken as an example to study the optimization problem of minimum temperature stress under different inner radii. The accuracy and convergence of different optimization methods are compared by setting three initial temperatures. The results show that the combination of sub-problem method and first-order method is the best. Based on this conclusion, the optimal calculation model of joint closure temperature for arch dam is established, and three methods are selected. The calculation shows that the above - mentioned combination method can obtain the optimal joint closure temperature, and the sub-problem method can meet the requirement under certain conditions.
关 键 词:拱坝 封拱温度 ANSYS优化 零阶法 一阶法 组合法
分 类 号:TV642.41[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.68.172