检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵健[1] 熊浩清 陈谦[1] 鞠平[1] 刘世凯[1] ZHAO Jian;XIONG Haoqing;CHEN Qian;JU Ping;LIU Shikai(College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, Jiangsu Province, China;State Grid Henan Electric Power Company, Zhengzhou 450052, Henan Province, China)
机构地区:[1]河海大学能源与电气学院,江苏省南京市211100 [2]国网河南省电力公司,河南省郑州市450052
出 处:《中国电机工程学报》2018年第6期1612-1621,共10页Proceedings of the CSEE
基 金:国家重点基础研究发展计划(973计划)(2013CB228204);国网河南省电力公司项目(SGHA0000DDJS1700010)~~
摘 要:特高压直流(ultra-high voltage direct current,UHVDC)输电有助于我国实现能源资源的优化配置,因而发展十分迅速。UHVDC送电容量大,当其发生闭锁后,会对电网造成严重的影响。因此,建立合适的功率模型,进而准确地分析UHVDC闭锁对受端电网的影响十分必要。该文首先分析了UHVDC闭锁后极间功率转移机理,以及建立了UHVDC逆变站的有功模型;其次分析了逆变站无功的消耗机理,并结合无功补偿设备投切策略,建立了闭锁后逆变站输出无功功率的模型;然后,采用所建立的模型,对天中直流"6.14"闭锁后逆变站的输出功率进行建模,并与实测逆变站的输出功率数据进行对比,验证所建模型的准确性较高。最后,将所建模型应用于河南电网仿真算例,仿真结果与实测数据进行对比,进一步验证了该模型的准确性。为适应UHVDC快速的发展,该文所提模型可为含UHVDC的实际电网的分析提供帮助。UHVDC projects,which are worthy of long distance transmission of mass electric power,are developed rapidly in China recent years.Due to the high transmission capacity of UHVDC,the blocking events could impact the whole power system significantly.Hence,based on suitable models,the accurate analysis of these impacts is necessary.Firstly,the mechanism of pole power transfer control was analyzed,and then the active power models of UHVDC inverter station were put forward.Secondly,the reactive power model of UHVDC inverter station was proposed based on the mechanism of the reactive power consumption and the switching strategy of reactive power compensation device.Thirdly,based on the proposed models,we modelled the output power of Tianzhong UHVDC inverter station during "6.14" blocking event.Furthermore,compared to the measured data of output power,the accuracy of the proposed models could be found.Finally,in the Henan power grid simulation case,the analysis results from the proposed models were compared with the measured data,which verified the accuracy of the models again.To support the rapid development of UHVDC,the proposed models in this paper could offer insights for the analysis of actual power system including UHVDC.
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.116