检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙志久 干建丽 SUN Zhijiu, GAN Jianli(Zhejiang zhe beihai hydropower Co. Ltd., lishui 323907, China)
机构地区:[1]浙江浙能北海水力发电有限公司,浙江省丽水市323907
出 处:《水电与抽水蓄能》2018年第1期80-84,共5页Hydropower and Pumped Storage
摘 要:滩坑发电机中性点设备及保护改造已成功实施,有必要对其技改过程进行归纳总结——在全面的内部短路仿真计算的基础上,经定量化及优化设计过程,立足于发电机原有分支分组方式增设了裂相横差保护,既显著提高了主保护配置方案的匝间短路保护灵敏性,又计及了发电机中性点侧铜环布置和分支TA安装的难度,将为后续水电站的技改工作提供借鉴。The technical renovation of neutral point device and main protect of Tankeng Hydro-generator has been successfully implemented.It is necessary to summarize the process of technical renovation–Based on the comprehensive internal fault simulation,the quantitative and optimization design process of main protection for Tankeng generator has been completed.The split-phase protection has been added based on the original branch grouping method.At the time of improving protection sensitivity for turnto-turn short-circuit,the main protection configuration scheme may not lead to the increase of difficulty to arrange the generator neutral-point copper collar and install branch TA.Above design experience will be verified in the subsequent technical renovation work of hydropower station.
关 键 词:大型水轮发电机 内部短路计算 主保护设计 裂相横差保护
分 类 号:TK73[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145