检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张胜利 ZHANG Shengli(Aksu Taheyuan Survey and Design Institute Co., Ltd., Aksu 843000, Xinjiang, Chin)
机构地区:[1]阿克苏塔河源勘测设计院有限公司,新疆阿克苏843000
出 处:《能源与节能》2018年第3期165-166,168,共3页Energy and Energy Conservation
摘 要:新疆生产建设兵团第一师沙井子灌区胜利渠48 km闸枢纽改建工程,原天然地基主要由承载力低、固结度差的低液限粘土和淤泥质粉质粘土组成,通过比较多种地基处理技术,最终确定采用井点降水联合低能量强夯方法进行地基加固处理,经检验各项指标均达到设计要求。The original natural foundation of reconstruction project of 48 km Brake Hub of Shengli Channel at Shajingzi Irrigated Area in First Division of Xinjiang Production and Construction Corps were composed of low liquid limit clay and grey silt-like soft soils with low bearing capacity and poor consolidation degree. Well-point dewatering combined with low-energy dynamic compaction method was finally determined to conduct foundation reinforcement treatment by comparing a variety of ground treatment,and all the indexes meet the design requirements.
关 键 词:井点降水联合低能量强夯 饱和低液限粘土 加固
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222